Tailor Made Programmes for Engineering Students

Basic Courses
S.No Course Code Course Name Duration

(Days)

Credit Points

 

1 CE/INT/01 Engineering Drawings Reading & Interpretation 2 Days 2/150
2 CE/INT/02  Tools & implements Used for Construction 2 Days 2/ 150
3 CE/INT/03 Familiarization with concrete making Machinery/ Shuttering & Scaffolding /Laboratory Equipment 2 Days 2/150
4 CE/INT/04 Familiarization with Construction Material (Cement / Steel/ Bricks / Paints / Glass / etc. 2 Days 2/150
5 CE/INT/05 Familiarization with the site Management Systems ( Part -1) ( HR/ Maintenance Operations) 2 Days 2/150
6 CE/INT/06 Familiarization with the Site Management systems ( Part -2)  ( Stores / Accounts / Safety / Quality Control) 2 Days 2/150
7 CE/INT/07 Hand Tools ( Mason/ Mechanical etc) 2 Days 2/150

 

8 CE/INT/08 Running  Mixer & vibrator for Concrete Mixing 2 Days 2/150
9 CE/INT/09 Scaffolds for  Shuttering fixing 2 Days 2/150

 

10 CE/INT/10 Concrete Mix Design Basics 2 Days 2/150

 

11 CE/INT/11 Field tests on Cement , Aggregate, Sand & Bricks 2 Days 2/150
12 CE/INT/12 Grinding welding 2 Days 2/150

 

Specialization: Lab Testing

 

13 CE/INT/LAB/01/17 Aggregate Testing 2 Days 2/150

 

14 CE/INT/LAB/02/17 Cement Testing 2 Days 2/150

 

15 CE/INT/LAB/03/17 Fly ash in construction 2 Days 2/150

 

16 CE/INT/LAB/04/17 Soil Testing 2 Days 2/150

 

17 CE/INT/LAB/05/17 Rebound hammer 1 Day 1/150

 

18 CE/INT/LAB/06/17 Core cutting of concrete 2 Days 2/150

 

19 CE/INT/LAB/07/17 Brick Testing 2 Days 2/150

 

20 CE/INT/LAB/08/17 Bitumen Testing 2 Days 2/150

 

Specialization: Surveying

 

21 CE/INT/SUR/01/17 Basics of Plane Table Surveying, 2 Days 2/150

 

22 CE/INT/SUR/02/17 Theodolite surveying 2 Days 2/150

 

23 CE/INT/SUR/03/17 Measuring Instruments Usage 2 Days 2/150

 

24 CE/INT/SUR/04/17 Understanding Types of Scales and Maps 2 Days 2/150
25 CE/INT/SUR/05/17 Leveling Work and Contour Survey 6 Days 6/150

 

26 CE/INT/SUR/06/17 Total Station Operations 6 Days 6/150

 

27 CE/INT/SUR/07/17 Control Point Surveying & fixation 1 Day 1/150

 

28 CE/INT/SUR/08/17 Error adjustment in surveying 2 Days 2/150

 

29 CE/INT/SUR/09/17 Remote height calculations 2 Days 2/150

 

30 CE/INT/SUR/10/17 Area and Volume calculations 2 Days 2/150

 

31 CE/INT/SUR/11/17 Data Management 4 Days 4/150

 

32 CE/INT/SUR/12/17 Transferring measurements to Auto Cad 4 Days 4/150
Specialization: Estimation, Specifications and Site Accounting

 

33 CE/INT/EST/SP/S-ACC/01/17 Quantity takeoff from structural drawings 4 Days 4/150
34 CE/INT/EST/SP/S-ACC/02/17 Quantity takeoff from architectural drawings 4 Days 4/150
35 CE/INT/EST/SP/S-ACC/03/17 Costing of Civil works 4 Days 4/150
36 CE/INT/EST/SP/S-ACC/04/17 Understanding Productivity of Human Resources 4 Days 4/150
37 CE/INT/EST/SP/S-ACC/05/17 Understanding specifications 4 Days 4/150
38 CE/INT/EST/SP/S-ACC/06/17 Creating Bill of quantities 4 Days 4/150
Specialization: Electrical

 

39 CE/INT/ELEC/01/17 Electric Safety precautions and system of wiring and color coding of wires 3 Days 3/150

 

40 CE/INT/ELEC/02/17 Ohm’s law and their calculation of V.I.R and Power 2 Days 2/150
41 CE/INT/ELEC/03/17 Protective devices and their use according to load 2 Days 2/150
42 CE/INT/ELEC/04/17 Controlling devices and their links with electric connection 2 Days 2/150
43 CE/INT/ELEC/05/17 Connection of single/ Double tube light connection with testing procedure and rectification of fault 3 Days 3/150
44 CE/INT/ELEC/06/17 Repair of domestic Electrical Appliances

(i) Room coolers/Desert cooler

(ii) Ceiling fan/ Table fan/ Wall fan/ Pedestal fan

(iii) Electric Iron/ Sandwich toaster

(iv) Mixer Grinder/ Hand drill machine

4 Days 4/150
45 CE/INT/ELEC/06/17 Importance of earthing, types of earthing and testing procedure 2 Days 2/150
46 CE/INT/ELEC/08/17 Star/Delta connection in 3 Ø system and calculation of power 2 Days 2/150
47 CE/INT/ELEC/09/17 Transformer working principals, its parts, advantages, cooling system 2 Days 2/150
48 CE/INT/ELEC/10/17 Indian Measures and Weight 2 Days 2/150

 

  49 CE/INT/ELEC/11/17 Electrical convention symbols, reading of electrical drawings 2 Days 2/150
50 CE/INT/ELEC/12/17 AC fundamentals, RLC circuits 3 Days 3/150

 

51 CE/INT/ELEC/13/17 Making of series and parallel circuits 3 Days 3/150

 

52 CE/INT/ELEC/14/17 Introduction to Sub-Station 2 Days 2/150

 

53 CE/INT/ELEC/15/17 Sub-Station Design Development 6 Days 6/150

 

54 CE/INT/ELEC/16/17 Sub-Station Design Calculations 6 Days 6/150

 

55 CE/INT/ELEC/17/17 Cable Routing 3 Days 3/150

 

56 CE/INT/ELEC/18/17 Earthing Protection Design 3 Days 3/150

 

57 CE/INT/ELEC/19/17 DSLP/Lightning Design 3 Days 3/150

 

 

58 CE/INT/ELEC/20/17 Illumination Design 3 Days 3/150

 

59 CE/INT/ELEC/21/17 Control & Protection System Design 3 Days 3/150

 

60 CE/INT/ELEC/22/17 Cable Selection & Sizing 3 Days 3/150

 

61 CE/INT/ELEC/23/17 Auxiliary System Design 3 Days 3/150

 

62 CE/INT/ELEC/24/17 Electrical Equipment/System Specification & Data Sheet 3 Days 3/150
Specialization: Barbending

 

63 CE/INT/BB /01/17 Understanding Barbending schedule 3 Days 3/150

 

64 CE/INT/BB /02/17 Reinforcement of columns, footings, beams, lintel and sunshades 3 Days 3/150
65 CE/INT/BB /03/17 One way slab and two way slab reinforcement 2 Days 2/150
66 CE/INT/BB /04/17 Reinforcement of staircases 2 Days 2/150

 

67 CE/INT/BB /05/17 Do’s and don’ts in reinforcement 1 Day 1/150

 

Specialization: Site Accountancy

 

68 CE/INT/SA /01/17 Understanding Bill of quantities 4 Days 4/150

 

69 CE/INT/SA /02/17 Accountancy for civil engineers 7 Days 7/150

 

70 CE/INT/SA /03/17 Billing procedures and invoice generation 7 Days 7/150
71 CE/INT/SA /04/17 Site Coordination and wages marking 7 Days 7/150

 

Specialization: Structural

 

72 CE/INT/STR /01/17 Basic Analysis & Design of Structures 3 Days 3/150

 

73 CE/INT/STR /02/17 Steel Frame Connection 2 Days 2/150

 

74 CE/INT/STR /03/17 Foundation Design. 2 Days 2/150

 

75 CE/INT/STR /04/17 Concrete Design & Analysis. 3 Days 3/150

 

76 CE/INT/STR /05/17 Pre- Engineered Buildings. 3 Days 3/150

 

77 CE/INT/STR /06/17 Construction Detailing & Drawings. 3 Days 3/150

 

 

78 CE/INT/STR /07/17 Storm Water & Sewage Design. 6 Days 6/150

 

79 CE/INT/STR /08/17 Bridges, Roads, & Design 6 Days 6/150

 

80 CE/INT/STR /09/17 Restoration & Rehabilitation of Structures. 3 Days 3/150
81 CE/INT/STR /10/17 Steel Analysis & Steel Design. 3 Days 3/150

 

Specialization: Site Planning

 

82 CE/INT/S-PLG /01/17 Prerequisites of construction of any project 2 Days 2/150
83 CE/INT/S-PLG/02/17 Site planning establishment and management 2 Days 2/150
84 CE/INT/S-PLG/03/17 Layout and excavation 2 Days 2/150

 

85 CE/INT/S-PLG/04/17 Safety health and environment 2 Days 2/150

 

86 CE/INT/S-PLG/05/17 Procurement, and stacking of construction materials 2 Days 2/150
87 CE/INT/S-PLG/06/17 Construction Inventory Management 2 Days 2/150

 

88 CE/INT/S-PLG/07/17 Site mobilization, layout of temporary facilities and installation 2 Days 2/150
89 CE/INT/S-PLG/08/17 Site visit and preparation of site visit report 2 Days 2/150
90 CE/INT/S-PLG/09/17 Laisioning work at project site 2 Days 2/150

 

91 CE/INT/S-PLG/10/17 General administration and management 2 Days 2/150
92 CE/INT/S-PLG/11/17 Ethics in construction 2 Days 2/150

 

Specialization: HVAC

 

93 CE/INT/HVAC/01/17 Clean Room Environment technology. 2 Days 2/150

 

94 CE/INT/HVAC/02/17 Energy conservation study & design. 2 Days 2/150

 

95 CE/INT/HVAC/03/17 Ducting Design. 2 Days 2/150

 

96 CE/INT/HVAC/04/17 Cold Storage refrigeration system design. 2 Days 2/150
97 CE/INT/HVAC/05/17 VRV’s / VRF’s system for residential & commercial buildings. 2 Days 2/150
98 CE/INT/HVAC/06/17 Design of Warehouses & Industrial Ventilation System. 2 Days 2/150
99 CE/INT/HVAC/07/17 Chilled Ceiling Technology. 2 Days 2/150

 

100 CE/INT/HVAC/08/17 Mechanical Ventilation for Car Parking & Basement area. 2 Days 2/150
101 CE/INT/HVAC/09/17 Thermal Storage System Design. 2 Days 2/150

 

102 CE/INT/HVAC/10/17 VRV’s / VRF’s system for residential & commercial buildings. 2 Days 2/150
Specialization: Plumbing

 

103 CE/INT/PLUMB/01/17 Plumbing system-water supply and drainage 2 Days 2/150
104 CE/INT/PLUMB/02/17 Domestic water supply and distribution system 2 Days 2/150
105 CE/INT/PLUMB/03/17 Plumbing layout drawings 2 Days 2/150

 

106 CE/INT/PLUMB/04/17 Fire extinguishing and Fire alarm systems 2 Days 2/150
107 CE/INT/PLUMB/05/17 Sanitary fixtures 2 Days 2/150

 

108 CE/INT/PLUMB/06/17 Hot and cold piping systems in bathrooms 2 Days 2/150
109 CE/INT/PLUMB/07/17 Fire detection, alarm and evacuation systems 2 Days 2/150
110 CE/INT/PLUMB/08/17 Wet riser system 2 Days 2/150

 

111 CE/INT/PLUMB/09/17 Laying, measuring, marking, cutting, threading, bending and jointing of external water supply systems 2 Days 2/150
112 CE/INT/PLUMB/10/17 Water supply service connection, testing of water supply lines 2 Days 2/150
113 CE/INT/PLUMB/11/17 Testing procedures of plumbing lines and construction of manholes, septic tanks and soakage pit 2 Days 2/150
Specialization: Formwork

 

114 CE/INT/F-WORK/01/17 Work procedures of all types of formwork 2 Days 2/150
115 CE/INT/F-WORK/02/17 DE shuttering periods for forms 2 Days 2/150
116 CE/INT/F-WORK/03/17 Shuttering at heights using soldiers and shutters 2 Days 2/150
117 CE/INT/F-WORK/04/17 Placing and removal procedure of formwork 2 Days 2/150
Specialization: Masonry

 

118 CE/INT/MASON/01/17 Building layout and setting out 2 Days 2/150

 

 

119 CE/INT/MASON/02/17 Transferring of levels and field testing of bricks, blocks, sand and cement 2 Days 2/150
120 CE/INT/MASON/03/17 Damp proof course 2 Days 2/150

 

121 CE/INT/MASON/04/17 Solid bricks and block masonry – Hollow concrete block masonry – 2 Days 2/150
122 CE/INT/MASON/05/17 Fixing of doors and windows frames 2 Days 2/150

 

123 CE/INT/MASON/06/17 Composite materials 2 Days 2/150

 

Specialization: Welding

 

124 CE/INT/WELD/01/17 Principle of manual, metal, arc welding 2 Days 2/150
125 CE/INT/WELD/02/17 Arc welding machines 2 Days 2/150

 

126 CE/INT/WELD/03/17 Types of welding joints, position and types of welds 2 Days 2/150
127 CE/INT/WELD/04/17 Edge preparation and its importance 2 Days 2/150

 

128 CE/INT/WELD/05/17 Gas welding and gas cutting process 2 Days 2/150

 

129 CE/INT/WELD/06/17 Welding process with TIG, MIG, SAW – Advantages and limitations 2 Days 2/150
Specialization: Painting

 

130 CE/INT/PAINT/01/17 Interior and exterior paints 2 Days 2/150

 

131 CE/INT/PAINT/02/17 Mixing methods of paints – Painting methods 2 Days 2/150
132 CE/INT/PAINT/03/17 Application of painting 2 Days 2/150

 

133 CE/INT/PAINT/04/17 spray painting, powder coating, anodizing, duco paints 2 Days 2/150
134 CE/INT/PAINT/05/17 Application of polish – Polyurethane coat etc 2 Days 2/150
135 CE/INT/PAINT/06/17 Drying methods 2 Days 2/150

 

Miscellaneous

 

136 CE/INT/MISC/01/17 Soft skills 2 Days 2/150

 

137 CE/INT/MISC/02/17 Occupational hazards 2 Days 2/150

 

138 CE/INT/MISC/03/17 PPE 2 Days 2/150

 

 

139 CE/INT/MISC/04/17 Time management 2 Days 2/150

 

140 CE/INT/MISC/05/17 Negotiations skills 2 Days 2/150

 

141 CE/INT/MISC/06/17 Office documentation 2 Days 2/150

 

142 CE/INT/MISC/07/17 Concrete mixture proportioning 2 Days 2/150

 

143 CE/INT/MISC/08/17 Advances in Construction materials 2 Days 2/150

 

144 CE/INT/MISC/09/17 Climate friendly buildings 2 Days 2/150

 

145 CE/INT/MISC/10/17 Special concrete 2 Days 2/150

 

146 CE/INT/MISC/11/17 Admixtures and their application 2 Days 2/150

 

147 CE/INT/MISC/12/17 Precast concrete buildings 4 Days 4/150

 

Specialization: Trenchless Technology

 

148 TT/INT//01/17 Soil classification and characteristics 3 days 3/150

 

149 TT/INT//02/17 Subsurface utility Engineering 3 days 3/150

 

150 TT/INT//03/17 Safety health and Environment 3 days 3/150

 

151 TT/INT//04/17 New Installation of pipeline through trenchless methods 3 days 3/150
152 TT/INT//05/17 Classification of trenchless equipment 3 days 3/150

 

153 TT/INT//06/17 Rehabilitation of pre-installed pipeline by trenchless method 3 days 3/150
154 TT/INT//07/17 Renewal of preinstalled pipeline by trenchless method 3 days 3/150
155 TT/INT//08/17 Geotechnical investigation 3 days 3/150

 

Walkover Locating

 

156 TT/INT/WOL/09/17 Basics of Mathematics & Measurement 3 days 6/150
157 TT/INT/WOL/10/17 Project Basics 6 days 12/150

 

158 TT/INT/WOL/11/17 HDD Basics 2 days 4/150

 

159 TT/INT/WOL/12/17 Locating Basics 2 days 4/150

 

160 TT/INT/WOL/13/17 Locating 4 days 8/150

 

161 TT/INT/WOL/14/17 Interference avoidance basics 2 days 4/150

 

162 TT/INT/WOL/15/17 Basic Bore path planning & Execution 3 days 6/150

 

163 TT/INT/WOL/16/17 Data recording and reporting 2 days 4/150